How does a contractor test the Controller/Sensor to see if it is wired correctly?
There is a button on each Controller/Sensor. Press it two times to turn the load on and off. Press it two times and hold to test and set the level of 0-10V dimming.
PreviousWhat type of sensor is the Lightcloud Sensor?NextWhat do the 3 light indicators on the Gateway mean?
Last updated